East Surrey College - ROOF TERRACE Refurbishment
KEY FACTS
DURATION
7 Weeks
PROJECT MANAGEMENT
Ash Technical Services
TYPE
Design & Build
VALUE
£120k
THE CLIENT
East Surrey College places strong emphasis on staff wellbeing and creating spaces that support a healthy working environment. The refurbishment of the unused roof terrace formed part of this wider initiative.
-
Ash Technical Services were appointed to rejuvenate an underused outdoor terrace into a welcoming staff wellbeing space. Working alongside Better Living Landscapes, we delivered:
A refreshed, modern outdoor area designed for relaxation
Durable new finishes and landscaping elements
Seating zones and improved access routes
A functional, attractive space for staff to use throughout the year
-
Transforming an exposed external terrace required:
Careful consideration of weathered surfaces and failing materials
Installing durable outdoor finishes with long-term resilience
Coordinating works around live areas below
Managing rooftop access, safety controls and material lifts
Delivering all works within the compressed summer timetable
-
We took a collaborative approach with the college and Better Living Landscapes.
Key steps included:
Early inspection of all existing substrates and waterproofing
Planned access routes and lifting arrangements for rooftop materials
Sequencing landscaping and finishing works to avoid damage to completed areas
Clear communication with Estates regarding noise, access and protection of areas beneath
-
The completed roof terrace now provides:
A calm and welcoming breakout space for staff
Modern, durable finishes suitable for year-round use
A significant uplift in wellbeing provision
A transformed area that had previously been underutilised
Delivered on time and with minimal disruption to college operations, the terrace is now a valued space for staff to relax and recharge.